Interstate 26 in North Carolina
Get Interstate 26 in North Carolina essential facts below. View Videos or join the Interstate 26 in North Carolina discussion. Add Interstate 26 in North Carolina to your PopFlock.com topic list for future reference or share this resource on social media.
Interstate 26 in North Carolina

Interstate 26 marker

Interstate 26
I-26 highlighted in red; future I-26 in blue
Route information
Maintained by NCDOT
Length53.67 mi (86.37 km)
Existed1966[1]-present
Tourist
routes
I-26 Scenic Highway
Major junctions
West end / at the Tennessee line near Faust
 
East end at the South Carolina line near Landrum, SC
Location
CountiesMadison, Buncombe, Henderson, Polk
Highway system
->

Interstate 26 (I-26) in North Carolina runs through the Western part of the state, from the Tennessee border to the South Carolina border, following the Appalachian Mountains. It is part of the larger I-26, a regional interstate that runs from Kingsport, Tennessee to in Charleston, South Carolina. I-26 is mostly four lanes through North Carolina with few exceptions. Though nominally an east-west route (because of the even number convention), in North Carolina and Tennessee, the route goes nearly north-south, with the northern direction labeled "West" and vice versa.

I-26's original western terminus was I-40/I-240 in Asheville. Between 2003 and 2005, the road was extended further north into Tennessee. Along the segment from Mars Hill to Asheville there are FUTURE I-26 signs as some parts of the road have not yet been upgraded to Interstate Highway standards.

Route description

I-26 in Polk County looking over Skyuka Mountain

I-26, in concurrency with US 23, enters the state at Sams Gap (elevation 3,760 feet (1,150 m)), from Tennessee. In the first 9 miles (14 km), designated as a scenic byway, it features mostly six travel lanes and three runaway truck ramps going eastbound. The freeway is also parallels US 23A, which was the original route before 2006. At exit 13, I-26 ends and Future I-26 begins; US 19 also joins from Burnsville.

At Weaverville, Future I-26 merges with US 25/US 70, coming from Marshall; however, US 25 soon disembarks in Woodfin and continues south along Merrimon Avenue. Future I-26 enters Asheville, while parallel with the French Broad River, and merges with westbound I-240/US 74A, with US 19/US 23; US 70 ends its concurrency by going eastbound I-240/US 74A instead and an additional exit at the major interchange provides access to downtown Asheville via Patton Avenue.

Crossing the French Broad River along Capt. Jeff Bowen Bridge (originally Smokey Park Highway Bridge before 2012), Future I-26/I-240 promptly exits with two-lanes to the right (same for both directions) while US 19/US 23/US 74A continue along Patton Avenue (exit 3). The interchange also features warning lights for "stopped traffic ahead", a common condition during rush hour. Between Patton Avenue (exit 3) and Haywood Road (exit 2), Future I-26/I-240 shares hidden concurrency with US 19 Bus./US 23 Bus.

At the major interchange with I-40, sometimes called Malfunction Junction,[2] both Future I-26 and I-240 end and I-26 begins again, with new concurrency with US 74. The interchange features left exit and entrances; while travelers along eastbound Future I-26/westbound I-240, access to eastbound I-40 is via NC 191 (Brevard Road - exit 1). Westbound I-40/US 74 continues on to Canton and Knoxville, eastbound I-40 provides access to nearby Biltmore Estate and further on to Hickory.

Near mile marker 36, the Blue Ridge Parkway crosses over I-26 with a 75.1-foot (22.9 m) clearance; access to the Blue Ridge Parkway is via NC 191 (exit 33).[3]

In Fletcher, I-26 goes by the Asheville Regional Airport and accesses NC 280 to Brevard and Mills River (exit 40); 3.2 miles (5.1 km) later, US 25 rejoins (exit 44). In Hendersonville, it connects with US 64, which connect travelers to nearby Chimney Rock, Lake Lure and Brevard. Between mile markers 53 and 54, I-26 crosses the Eastern Continental Divide (elevation 2,130 feet (650 m)), at the Crest Road overpass (SR 1803). Near East Flat Rock, US 25 separates again towards Greenville; while I-26 goes southeasterly down along Dodging Hill and crosses over the Green River along Peter Guice Memorial Bridge, with a clearance of 235-foot (72 m) from the river, making it the highest bridge in North Carolina.[4]

At Howard Gap (elevation around 1,900 feet (580 m)), an additional truck lane is available on westbound I-26 for 3 miles (4.8 km). In Columbus, US 74 ends concurrency at exit 67, continuing east towards Shelby. At 71.4 miles (114.9 km) (combining I-26 and Future I-26), I-26 crosses the state line and into South Carolina.[5][6]

Aerial view of Asheville Regional Airport with I-26 is on the right

I-26 also make up part of Corridor B in the Appalachian Development Highway System (ADHS). Corridor B connects I-40, in Asheville, North Carolina, with US 23, near Lucasville, Ohio, it overlaps 9 miles (14 km) of I-26 and 22 miles (35 km) of Future I-26. ADHS provides additional funds, as authorized by the U.S. Congress, which have enabled I-26 to benefit from the successive improvements and widening along its routing within the corridor. The white-on-blue banner "Appalachian Highway" is used to mark the ADHS corridor.[7]

I-26 overlaps with one state scenic byway simply known as the "I-26 Scenic Byway." Located from the Tennessee state line to Exit 9 (US 19/US 23A), near Mars Hill. The byway is known for its unspoiled views of the North Carolina Mountains.[8]

Dedicated and memorial names

I-26 in North Carolina has one dedicated or memorialized section of freeway.

  • Liston B. Ramsey Freeway - official name of I-26, on the section that overlaps with US 23 in Madison.[9]

History

I-26 appeared in the original Interstate Highway plans running from Charleston to Asheville. The road was first mapped as an under construction highway from US 25 near Hendersonville north to NC 280 (current NC 146). The first segment opened in 1966 beginning at NC 280 to the US 25 connector near East Flat Rock. In 1969, I-26 was extended north to I-40 and the South Carolina segment was extended to NC 108 near Columbus. In 1973, I-26 was extended from the US 25 connector to Saluda. Three years later I-26 was connected. The segment from Saluda to NC 108 was completed.[] In Fall 2003, when the Madison County section opened, the Buncombe County section received the designation "Future I-26" because it did not meet interstate standards. Starting in 2021. the section north of Asheville is scheduled for upgrades.[10]

Building through Howards Gap

One of the hardest places to build I-26 was in Howards Gap. The work was delayed by numerous landslides along Miller Mountain and Tryon Peak. Special engineering had to be done to continue work on I-26 through the area. The most important part was controlling the soil and water on the mountains and surrounding areas. This was achieved through the installation of miles of underground pipe used to drain water from the road.

Future

In 2013, the North Carolina Department of Transportation (NCDOT) reopened the idea of widening I-26 from I-40, in Asheville, to US 25, near Flat Rock. The project had been planned 10 years earlier but was stopped by legal challenges. In 2015 it qualified and became part of the 2016-2025 State Transportation Improvement Program (STIP) and will cost $396 million to build. Right-of-way acquisition begins in 2018, with construction set to begin in 2020.[11]

The I-26 Connector is a $600-$800 million project to build the missing gap of I-26 through Asheville. Broken into three sections, they are all planned and funded in the 2016-2025 STIP. Section A, between Haywood Road and Brevard Road, will be a widening project with reconfiguration of ramps at Haywood, Amboy and Brevard. Section B, between north of Haywood Road to US 19/US 23/US 70, is the most expensive section of the project, at $332 million. After a review of various alternative designs, both state and federal agencies choose Alternative 4B, which will convert Patton Avenue along Bowen Bridges to local traffic and reroute I-240 along I-26 further north.[12] Section C, the I-26/I-240/I-40 interchange, will be reconfigured to include missing ramp connects and a widening of I-40 through the area. The approximately 7-mile (11 km) project will begin right-of-way acquisition in 2019, with construction on all three sections in 2021.[13][14]

Another project, between Broadway Avenue and US 19/US 23A interchanges, will be upgraded to interstate standards; by replacing bridges, adding highway width and shoulders. The project, needed so I-26 can fully be labeled along that stretch, is currently in development. The estimated cost is $99 million, with right-of-way acquisition starting in 2020 and construction in 2022.[11][15]

Exit list

CountyLocationmikmOld exitNew exitDestinationsNotes
Madison0.00.0 west / north - Johnson CityContinuation into Tennessee; crosses through Sam's Gap
3.45.53 south - Wolf Laurel
9.014.59 north / north - Burnsville, Spruce PineNorth end of US 19 overlap
Mars Hill10.917.511 - Mars Hill, Marshall
Buncombe13.221.213Forks of Ivy
Route transition from I-26 to Future I-26
Flat Creek15 - Jupiter, BarnardsvilleExisting interchanges of US 19/US 23 (upgrade to interstate standards, funded)[15]
Stocksville17Flat Creek
Weaverville18
south / Monticello Road - Weaverville
19 north / west - Marshall, Weaverville
21New Stock Road - Weaverville
Woodfin23
south / north (Merrimon Avenue) - Woodfin, North Asheville
24Elk Mountain Road  Woodfin
Asheville25 - UNC Asheville
Hill Street
/ / east / Patton AvenueExisting interchanges of I-240 (realign and upgrade to interstate standards, partially funded)[13]
3BWestgate / Resort Drive
3A / south / west (Patton Avenue)

/ begin
2
/ south (Haywood Street) - West Asheville
1CAmboy Road
1B (Brevard Road) to
Route transition from Future I-26 to I-26
31.450.51B31B west / west - Canton, KnoxvilleWest end of I-240 / US 74 overlap
31.951.31A31A east - Hickory, Biltmore EstateWestbound exit and eastbound entrance
33.053.1233 / Blue Ridge ParkwayTo Asheville Outlets
37.760.7637 - Skyland
Arden40.865.7940 - Asheville Regional Airport, Arden, BrevardTo WNC Agriculture Center
HendersonFletcher44.171.01344
north / south - Fletcher, Mountain Home
North end of US 25 overlap
Hendersonville49.980.31849 - Hendersonville, Bat CaveSigned as exits 49A (east) and 49B (west)
53.485.92253Upward Road - Hendersonville
54.487.52354 south to /  - GreenvilleSouth end of US 25 overlap; to Carl Sandburg Home and Flat Rock Playhouse
Green River56.590.9Peter Guice Memorial Bridge
PolkSaluda59.695.92859Holbert Cove Road
Columbus66.6107.266 east - Forest City, ShelbyWestbound exit[16]
67.1108.03667 east /  - Columbus, Rutherfordton, TryonEast end of US 74 overlap
71.4114.9 east - SpartanburgContinuation into South Carolina
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. ^ "I-26 Fact Sheet" (PDF). North Carolina Department of Transportation. June 21, 2008. Archived from the original on June 21, 2008. Retrieved 2014.CS1 maint: BOT: original-url status unknown (link)
  2. ^ Boyle, John (October 2, 2016). "Answer Man: Hope for Exit 44 area on I-40? Republicans first?". Asheville Citizen-Times. Retrieved 2016.
  3. ^ "Uglybridges.com: Blue Ridge Parkway over I-26". Retrieved 2014.
  4. ^ "Bridgehunter.com: Peter Guice Memorial Bridge". Retrieved 2014.
  5. ^ Google (November 29, 2013). "Overview Map of I-26 in North Carolina" (Map). Google Maps. Google. Retrieved 2013.
  6. ^ "Guide to Geologic Points of Interest Along Interstate 26". North Carolina Geologic Survey. Retrieved 2013.
  7. ^ "Status of Corridors in North Carolina" (PDF). Appalachian Regional Commission. September 30, 2013. Archived from the original (PDF) on February 3, 2015. Retrieved 2014.
  8. ^ "NCDOT: Scenic Byways". Retrieved 2011.
  9. ^ "North Carolina Memorial Highways and other Named Facilities" (PDF). North Carolina Department of Transportation. July 15, 2004. Archived from the original (PDF) on December 29, 2012. Retrieved 2013.
  10. ^ Boyle, John (July 10, 2018). "Answer Man: Will 'Future I-26' ever be 'Just 26?' Are medical inhalers recyclable?". Asheville Citizen-Times. Retrieved 2018.
  11. ^ a b "2016-2025 State Transportation Improvement Program (STIP) - Division 13" (PDF). North Carolina Department of Transportation. June 2015. Retrieved 2016.
  12. ^ Barrett, Mark (May 19, 2016). "Connector route taking traffic off Bowen Bridge picked". Asheville Citizen-Times. Retrieved 2016.
  13. ^ a b "I-26 Connector, Asheville, NC". Project Details. North Carolina Department of Transportation. Retrieved 2013.
  14. ^ "I-26 Connector Visualization". North Carolina Department of Transportation. Retrieved 2016.
  15. ^ a b "US 19/23 (Future I-26) Improvements Project". Project Details. North Carolina Department of Transportation. Retrieved 2013.
  16. ^ "NCDOT I-4729A Signing Plans" (PDF). Retrieved 2018.

External links

Route map:

KML is from Wikidata


Interstate 26
Previous state:
Tennessee
North Carolina Next state:
South Carolina

  This article uses material from the Wikipedia page available here. It is released under the Creative Commons Attribution-Share-Alike License 3.0.

Interstate_26_in_North_Carolina
 



 



 